Started plumbing building 4 today.

Most of the potable water plumbing got finished in the utility room today, but we haven't received the balancing set yet. We should have them tomorrow, until then we'll be insulating more, wiring controllers and plumbing T&P relief valve.

The electrician will be there tomorrow to start wiring the water heaters for the switch over from old WH's to the new WH's

Today we started in building #4. We got the solar loop started and almost done, then started on the potable water plumbing. You can see the solar tree ( pump, flowmeter, fill set and expansion tank ) in the back ground. The water heater is on the left and the two 120 gallon solar tanks ( that are plumbed in parallel) are one the right. We got some insulating done too.

Tomorrow we will have all of the potable water loop done and insulated..